01732 454 960
Case Studies

EnjoyWork Chiswick Park

January 2016


Design, supply & installation of 2X chilled water pressurisation systems to work along side the existing Trane chillers serving building 3 & 4 carried out by Dunn AC Limited.

To size the correct pressurisation systems to allow correct operation of the chilled water systems and identify suitable location for these to be installed and connected to the water circuit. Full operation and maintenance manuals were supplied following successful completion.

More case studies

Some of our recent clients:

Our accreditations:

Constructionline