From Retail Sites on the High Street, Commercial Installations through to Industrial Estates, DUNN AC have built an enviable reputation for delivering high quality projects on time, on specification and on budget.

The following is a small selection of the many case studies that have be completed successfully. Many more can be provided upon request.

Swan Walk Shopping Centre Horsham;

October 2016

Dunn AC Limited were asked by our client to complete a new installation of a cooling/heating system serving the management suit.

View details

High Street Bank, Cambridge

March 2016

Dunn AC limited were asked by their client to supply replacement NG heating system for there failing aged system on site.

View details

H Samuel Eastleigh Southampton

October 2016

Dunn AC limited were asked by their client to supply a replacement cooling system for their failing aged system on site.

View details

Velocity V1 Brooklands, Weybridge

October 2016

Dunn AC Limited were asked by our client to be the main HVAC contractor to carry out the refurbishment of Velocity V1 building on the prestigious Brooklands Estate.

View details

High Street Bank Tower Exchange, Canary Wharf

August 2016

Following an emergency call out attendance by Dunn AC Engineers it was identified that the main chiller plant serving the clients emergency crash suite and IT department had failed components.

View details

Virgin Atlantic Ticket Office, Gatwick Airport, North Terminal

November 2016

Dunn AC were asked by their client to carry out the supply & installation of a new cooling system serving the Virgin Atlantic Ticket office located at Gatwick Airport, North Terminal.

View details

High Street Bank Canterbury

January 2016

To replace all natural gas fired boilers to site with new condensing type systems.

View details

Warner Bros De Lane Lea Studios Soho

April 2016

Design, supply and installation of 160kW of comfort cooling to the new recording and design area

View details

High Street Bank Borehamwood

September 2015

Branch refurbishment carried out by Dunn AC Limited.

View details

Bethlem Hospital Beckenham

August 2016

To carry out a refurbishment of main trusts comms room to replace critical cooling systems within a 'live' environment.

View details

High Street Bank Thornbury Bristol

January 2016

Branch refurbishment carried out by Dunn AC Limited following 'gas attack' to external ATM's.

View details

DHL Barking

January 2016

Design, supply and installation of 18X split and multi split air conditioning systems providing comfort cooling to all areas of the distribution building.

View details

EnjoyWork Chiswick Park

January 2016

Design, supply and installation of 2X chilled water pressurisation systems to work along side the existing Trane chillers serving building 3 & 4 carried out by Dunn AC Limited.

View details